Get ready for your power system interview with this comprehensive guide of top power system interview questions and sample answers. Master your interview preparation now!
Similar Posts

What is the Duty Cycle/Operating Sequence of Circuit Breaker specified on the Name Plate
[We keep wondering what the heck this sequence on the name plate of the Circuit Breakaer. Lets find it out now. What is the Duty Cycle/ Operating Sequence of CB? It is the Mechanical Duty requirement to be fulfilled by the Operating Mechanism of the Breaker and specified on the Name Plate of the Breaker…
Buchholz Relay in Transformer
Bucholz Relay provides Mechanical Protection for Transformer. What is a Buchholz Relay? What is the Working Principle of Buchholz Relay? 1.Accumulation Of Gases: Whenever a fault occurs inside the transformer, such as Arcing, Partial Discharge, Insulation failure of turns, breakdown of core or excess core heating, the fault is accompanied by production of excess heat….
Power System
Power System, mainly includes following things: Basic Components of a Power Transmission System are as follows: Basic Components of a Substation are as follows:
Why CT Polarity is so very important?
First of all we will find out what is polarity and then we will see why it is so important in CT. What is Polarity ? It is the Polarity of Voltage present between High Voltage Terminal and the Low Voltage Terminal. It can also be referred as, the direction of the current flow.In the…
Auto reclosing EHV Transmission Lines : A Guide on Circuit Breaker Recloser
Only 5% of the faults are of the Permanent nature, rest are transient faults and so auto reclosing EHV Transmission Lines has become a generally accepted practice in Power System. What is Auto-reclosing in EHV Lines ? Ans: Auto-reclose is automatically reclosing a Circuit Breaker in a set time after it has been opened due…
Polarization index (PI) test on Insulators
All Electric Insulations are dielectric in Nature and have a Capacitive Property. During application of Voltage across the Electrical Insulation, initially there will be a charging current After few instants, the Insulation becomes totally charged and the Capacitive Chrging Current becomes zero. Hence, it is recommended tp measure insulation resistance after 1 Minute from instant…